      1. The main difference between vertical and horizontal electroplating lines in the maintenance and upkeep of the tank body lies in the different transportation methods of the circuit board, while the maintenance and upkeep methods for the tank body are essentially similar. 7 days, each water washing tank should be cleaned once. The acid washing tank should be cleaned once and its solution should be replaced; Conduct an inspection of the spray device inside the tank to check for any blockages, and promptly unblock any blockages that may occur; When cleaning the conductive supports and anode contact points on the copper plating tank and tin plating tank, a cloth can be used to wipe and sandpaper can be used to polish them; Inspect the titanium basket and tin bar basket of the copper plating tank and tin plating tank once, replace the damaged titanium basket bag and tin bar basket, and add copper balls and tin bars. After adding copper balls and tin bars in 7 days, the electroplating copper tank and tin plating tank must be electrolyzed. 7d also needs to use high and low current methods for trial production, so that after adding new copper balls and tin bars, the production performance can be stable before proceeding with production. Clean the copper balls and anode bags every 90 days. Filter and clean the bath solution with activated carbon every 120-150 days to remove impurities, and clean the tin bath once.

      2. The maintenance and upkeep of the vertical electroplating line vibration mechanism. In order to ensure the uniformity of surface copper and the effect of hole copper during electroplating, the plate will be vibrated and swayed, and there will be a vibration and swaying mechanism on the tank body.

      After 30 days, the gearbox should be inspected to see if it is running properly and to check its tightness; To check the tightness of the vibration installation motor bolts; Check the wear of the vibrating rubber, and for those with severe wear, replace them in a timely manner.

      180d Check the contact situation of the power lines inside the junction box. If any joints are loose, tighten them in a timely manner. For power lines with melted or aged insulation layers, replace them in a timely manner to ensure the insulation between the power lines; All bearings on the vibration mechanism should be inspected once, and the lubricating grease should be replaced in a timely manner for severely worn bearings.

    Send Inquiry

    Name*

    Email*

    Message

    Get Price

    Or call +86 755 2794 4155

    Inquiry Now

    Name *

    Country

    Email *

    Company *

    Phone Number

    Massage

    What is the best way to contact you?