1. Engineering design: The arrangement of interlayer semi cured sheets should correspond;
Multi layer core boards and semi cured sheets should use the same supplier's products;
The outer C/S surface graphics area should be as close as possible, and independent grids can be used;
2. Drying board before cutting
Generally, at 150 degrees Celsius for 6-10 hours, the moisture inside the board is removed, further allowing the resin to cure completely and eliminating stress inside the board; Drying the board before opening, both the inner layer and both sides are required!
3. Before laminating the multi-layer board, attention should be paid to the longitudinal and latitudinal directions of the cured sheet:
The shrinkage ratio in the warp and weft directions is different, so pay attention to distinguishing the warp and weft directions before cutting and stacking the semi cured sheet; When cutting the core board, attention should also be paid to the warp and weft directions; The general direction of the cured sheet roll is in the warp direction; The length direction of the copper clad plate is meridional;
4. After laminating the thick stress relieving pressure plate, cold press and trim the rough edges;
5. Drying plate before drilling: 150 ° C for 4 hours;
6. It is recommended to use chemical cleaning instead of mechanical grinding and brushing for thin plates; Special fixtures are used during electroplating to prevent bending and folding of the board;
7. After tin spraying, cool naturally on a flat marble or steel plate to room temperature or air float bed for cooling before cleaning;
Warping plate treatment:
150 degrees Celsius or hot pressing for 3-6 hours, using a flat and smooth steel plate for heavy pressing, 2-3 times baking.